Modification # | Description | Disclosure # | Award Date | Start Date | End Date | Amount |
---|---|---|---|---|---|---|
239541
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/26/2011 | ($20,160.00) | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/18/2015 | $75,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/19/2015 | $214,080.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/25/2015 | $45,000.00 | ||||
23954103
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/29/2015 | ($1,131,647.03) | |||
23954104
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/01/2015 | ($386,584.00) | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/19/2015 | ($38,577.19) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/24/2015 | ($18,194.37) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 03/08/2016 | $232,000.00 | ||||
23954108
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 04/26/2016 | $1,685,750.96 | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/12/2016 | $58,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/29/2012 | $5,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/17/2016 | $195,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/18/2016 | $27,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/28/2016 | $1,043.09 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/04/2016 | $135,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/13/2016 | $16,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/31/2016 | ($214,080.00) | ||||
23954117
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/02/2016 | ($510,658.59) | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/02/2012 | $100,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 12/12/2016 | ($16,300.81) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/12/2017 | ($23,596.03) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/23/2017 | $141,371.88 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/26/2017 | $15,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/01/2017 | $23,343.66 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/03/2017 | $59,544.70 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/06/2017 | $59,006.11 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/07/2017 | $43,106.30 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/10/2017 | $21,088.79 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/14/2017 | ($43,005.54) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/03/2012 | $35,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/21/2017 | $22,897.72 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/23/2017 | $20,959.37 | ||||
23954132
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/24/2017 | ($227,133.18) | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/27/2017 | $102,195.48 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/28/2017 | $19,225.52 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 03/01/2017 | $87,318.13 | ||||
23954137
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 03/02/2017 | $29,895.10 | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 04/12/2017 | $380,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/06/2012 | $70,000.00 | ||||
23954140
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/02/2017 | ($145,945.40) | |||
23954141
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/06/2017 | $160,000.00 | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/03/2017 | ($7,384.86) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/11/2017 | $680,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/14/2017 | $330,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/15/2017 | $2,252,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/16/2017 | $400,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/18/2017 | ($82,627.38) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/21/2017 | ($29,318.83) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/28/2017 | ($22,342.60) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/09/2012 | $17,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/17/2017 | ($8,137.77) | ||||
23954154
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 12/14/2017 | ($154,156.63) | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/03/2018 | $306,759.22 | ||||
23954156
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/05/2018 | $103,978.00 | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 04/05/2018 | ($7,562.48) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/04/2019 | $327,723.11 | ||||
23954159
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/25/2019 | ($38,486.87) | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/11/2012 | $13,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/02/2019 | $50,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/24/2019 | ($30,366.52) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/29/2019 | $39,022.68 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/20/2019 | $53,195.25 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 12/11/2019 | $125,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/10/2020 | $349,555.86 | ||||
23954166
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/19/2023 | $0.00 | |||
23954167
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/21/2023 | $723,982.16 | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/30/2023 | ($9,109.97) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/12/2012 | $20,000.00 | ||||
2395418
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/25/2012 | $267,879.00 | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/27/2012 | $80,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/04/2012 | $31,185.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/02/2012 | $15,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/04/2012 | $22,362.13 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/05/2012 | $902,212.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/10/2012 | $16,506.36 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/11/2012 | $76,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/15/2012 | $6,100.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/23/2012 | $35,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/25/2012 | $15,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 10/29/2012 | $80,000.00 | ||||
2395429
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/14/2012 | ($14,724.75) | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/12/2012 | $200,000.00 | ||||
2395430
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 12/21/2012 | $10,500.00 | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 03/06/2013 | $4,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 03/27/2013 | ($73.24) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/08/2013 | $63,055.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/09/2013 | $123,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/10/2013 | $50,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/13/2013 | $35,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/14/2013 | $20,640.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/16/2013 | $89,585.81 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/17/2013 | $15,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/17/2012 | $15,500.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/20/2013 | $22,238.08 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/22/2013 | $519.28 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/23/2013 | $50,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/04/2013 | $2,500.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/05/2013 | $35,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/05/2013 | $10,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/06/2013 | $6,600.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/11/2013 | $3,324.42 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/12/2013 | $2,842.85 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/17/2013 | $11,400.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/17/2012 | $75,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/18/2013 | ($1,597.83) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/19/2013 | $350.67 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/20/2013 | $6,738.91 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/21/2013 | ($4,670.37) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/21/2013 | $11,808.56 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/04/2013 | $229,610.27 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/05/2013 | $50,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/06/2013 | $20,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/11/2013 | $25,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/12/2013 | $89,200.06 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 01/17/2012 | $18,100.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 09/17/2013 | $87,163.34 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/01/2013 | $50,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/04/2013 | $50,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/05/2013 | $29,742.70 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/06/2013 | $25,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/18/2013 | $30,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/20/2013 | $9,921.58 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 11/21/2013 | $40,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 12/16/2013 | $1,999.36 | ||||
2395469
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 03/10/2014 | ($29,070.25) | |||
239547
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 02/28/2012 | ($27,893.75) | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 03/12/2014 | ($863.59) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 03/19/2014 | ($18,252.29) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/10/2014 | $4,486.30 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/18/2014 | $35,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 03/26/2015 | $1,349,075.06 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 04/03/2015 | $20,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 04/06/2015 | $25,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 04/03/2012 | $10,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 04/07/2015 | $49,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/11/2015 | $5,051.19 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/14/2015 | $7,500.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 05/26/2015 | $10,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/01/2015 | $310,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/05/2015 | ($13,016.61) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 06/08/2015 | ($4,030.91) | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/13/2015 | $71,492.75 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/14/2015 | $142,610.63 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 04/04/2012 | $6,921.80 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/15/2015 | $70,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/16/2015 | $218,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/17/2015 | $20.11 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/20/2015 | $16,000.00 | ||||
2395494
| E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/21/2015 | $986,120.60 | |||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/22/2015 | $38,048.03 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 07/27/2015 | $17,097.22 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/04/2015 | $70,500.10 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/10/2015 | $80,000.00 | ||||
E. 130th Street/S. Brainard Ave./S. Torrence Ave./Intersection Improvements & Grade Separation - Main Contract | 08/12/2015 | $75,000.00 |