In order to view the Contract and Award Listings, you need to download Acrobat Reader.
Click on a column title to sort the records. For information and supporting documents concerning amendments, modifications and/or extensions to a contract, click the "Details" link in the search results.
DUR in the Award Amount column means that the contract award total Depends Upon Requirements. A Depends Upon Requirements contract is an indefinite quantities contract in which the city places orders as needed. The vendor is not guaranteed any particular contract award amount.
38 record(s) found
Agency | Contract (PO) # | Specification # | Award amount | Award date | Commodity or service | Department | |
---|---|---|---|---|---|---|---|
CITY | 579313 | Up To $9,999,991.00 | 03/18/2020 | Phase 1 & Phase 2 Design Engineering & Architectural Services for Replacement of the State/Lake Loop Elevated CTA Station | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | C968990037 | $1,187,577.77 | 10/14/2003 | Prof. Const. Eng. Sevices Expressway Viaduct Program | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 75799 | Up To $20,749,513.00 | 04/19/2010 | Program Manager for Wacker Dr. Viaduct Reconstruction/Congress PKWY Interchnge Imprvmnts. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | C968990038 | $419,999.64 | 09/22/2006 | Streetscape Improvements Clark Street: Ainslie to Montrose | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 56460 | Up To $5,000,000.00 | 07/19/2007 | Task Order Design Engineering Services (Project Categories 1-7) Roadway Design, Traffic Studies and Traffic Facilities Design Services | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | C968990037 | Up To $3,000,000.00 | 06/27/2006 | Proj. #16B Prof. Const. Engr. Serv. Task Order Bridge Const. Engr. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 86334 | Up To $7,112,500.00 | 09/14/2011 | NEW ECONOMY PARKING STRUCTURE (RFQ) | DEPT OF AVIATION | Details | |
CITY |
C029659
|
C968990037 | $278,728.75 | 07/11/2001 | CONSTRUCTION ENGINEERING SRVC:MILWAUKEE AV VIADUCT OVER I-90 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
CITY | 21694 | Up To $4,000,000.00 | 11/09/2004 | Professional Engineerin Services for, Quality Control/Quality Assurance Engineer | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | C925990002 | Up To $3,100,000.00 | 06/24/2005 | Prof. Design Engineering Services-US Route 41 Reconstruction:79th St. to S. Harbor Dr./Ewing Ave. | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY |
T3906292320
|
B39062923 | Up To $500,000.00 | 04/19/1996 | DESIGN & CONSTRUCTION MGT OF BRIDGE IMPROVEMENTS | Details | |
CITY | 132659 | Up To $22,485,402.78 | 12/27/2016 | PROFESSIONAL QUALITY CONTROL AND QUALITY ASSURANCE CONSTRUCTION INSPECTION ENGINEERING SERVICES (QA/QC) | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 53021 | Up To $3,000,000.00 | 09/18/2007 | Task Order Professional Construction Engineering Services ADA Ramps 2007 and 2008 Program | Details | ||
CITY | 53021 | Up To $3,000,000.00 | 02/21/2008 | Task Order Professional Construction Engineering Services ADA Ramps 2007 and 2008 | Details | ||
CITY | 52064 | DUR | 01/30/2007 | TASK ORDER PROFESSIONAL DESIGN ENGINEERING SERVICES STREETSCAPE, RIVERWALK AND URBAN DESIGN | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 140827 | DUR | 06/11/2018 | PROFESSIONAL SEWER CONSTRUCTION ENGINEERING SERVICES | DEPARTMENT OF WATER MANAGEMENT | Details | |
CITY | 129543 | DUR | 09/16/2016 | MASTER TASK ORDER CONTRACT FOR CONSULTING SERVICES AGREEMENT FOR SURFACE TRANSPORTATION PLANNING STUDIES CATEGORIES 1-5: AWARDED CATEGORIES ONE, TWO, AND FOUR | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 108082 | Up To $5,096,489.00 | 07/26/2013 | PROFESSIONAL CONSTRUCTION ENGINEERING SERVICES BLOOMINGDALE TRAIL AND PARK RENOVATION | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY |
T26810
|
B29068601 | DUR | 04/19/1996 | SERVICES, DESIGN ENGINEERING ARTERIAL ST/ROADWAYS IMPROVEMNT | Details | |
CITY |
C029723
|
C925990002 | $321,717.00 | 08/14/2001 | DESIGN OF ROADWAY & ROADSIDE ENHANCEMENTS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
CITY | 1296 | Up To $2,000,000.00 | 10/06/2003 | SURFACE TRANSPORTATION PLANNING STUDIES | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 53018 | Up To $2,499,218.69 | 06/18/2007 | Prof. Design Engineering Services, Elevated Transit Station Design, Morgan St. EL CTA Green Line | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 114941 | DUR | 02/04/2016 | MASTER TASK ORDER CONTRACT TASK ORDER SERVICES DESIGN ENGINEERING FOR COMPLETE STREETS PROJECT GROUPS 1-5: PROJECT GROUP 1 AWARDED | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 129997 | Up To $1,849,954.60 | 05/02/2017 | PROJECT 2: 41ST STREET PEDESTRIAN BRIDGE OVER METRA/CNRR | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | C968990038 | $55,000.00 | 08/31/2004 | Streetscape Improvement-18th St.Improvements:Damen Av. to Halsted | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 1296 | $644,822.00 | 01/23/2004 | SURFACE TRANSPORTATION STUDIES CHICAGO AIRPORT EXPRESS RAIL SERVICE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY |
T4918420322
|
B49184203 | Up To $440,097.00 | 04/30/1996 | BRIDGE DESIGN/CONSTRUCTION ENGINEERING CONSULTING SERVICES | Details | |
CITY | 112583 | Up To $4,745,048.00 | 12/06/2013 | PROFESSIONAL ENGINEERING SERVICES FOR THE CHICAGO TUNNEL SYSTEMS | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 80020 | Up To $9,286,109.21 | 02/27/2011 | Professional Quality Control/Quality Assurance Construction Engineering Services | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY |
C029660
|
C968990037 | $111,254.84 | 07/16/2001 | CONSTRUCTION ENGINEERING SERVICE:NATOMA AV VIADUCT OVER I-90 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
CITY | C925990002 | Up To $419,339.00 | 11/02/2006 | TRAFFIC SIGNAL INTERCONNECT PROJECT 95TH STREET - WESTERN TO EWING AVE | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 118890 | DUR | 10/07/2016 | MASTER TASK ORDER CONTRACT PROFESSIONAL ENGINEERING SERVICES HIGHWAY/ROADWAY DESIGN, TRAFFIC STUDIES AND DESIGN (FOR TASK ORDERS) CATEGORIES 1-7: CATEGORIES 1, 2, AND 4 AWARDED | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY | 1155535 | Up To $1,500,000.00 | 03/03/2023 | 1155535: RFQ FOR PROFESSIONAL DESIGN ENGINEERING SERVICES FOR 92ND STREET BASCULE BRIDGE OVER THE CALUMET RIVER - CDOT PROJECT NO. E-7-479 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details | |
CITY |
241988
|
137797 | DUR | 09/12/2023 | TRANSFERRED FROM PO 65967 TERM AGREEMENTS FOR CONSTRUCTION MANAGEMENT SERVICES NON-TARGET MARKET | DEPARTMENT OF WATER MANAGEMENT | Details |
CITY |
241983
|
140827 | Up To $4,541,010.97 | 09/12/2023 | TRANSFERRED FROM PO 71112 PROFESSIONAL SEWER CONSTRUCTION ENGINEERING SERVICES | DEPARTMENT OF WATER MANAGEMENT | Details |
CITY |
241908
|
237824 | Up To $35,983.22 | 09/12/2023 | TRANSFERRED FROM PO 59855 - CONSTRUCTION ENGINEERING SERVICES IRVING PARK ROAD BRIDGE OVER THE CHICAGO RIVER CDOT PROJECT NO. E-5-038 | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |
CITY | 1131763 | Up To $25,000,000.00 | 08/11/2023 | PROFESSIONAL CONSTRUCTION ENGINEERING SERVICES FOR CITY-WIDE CDOT ROADWAY AND BRIDGE PROJECTS - TASK ORDER SERVICES - MASTER CONSULTING AGREEMENTS | Details | ||
CITY | 1204697 | Up To $10,000,000.00 | 11/29/2023 | MASTER TASK ORDER CONTRACT PROFESSIONAL DESIGN ENGINEERING SERVICES FOR GROUPS 2 THROUGH 4 PHASE I AND II TASK ORDER SERVICES, GROUPS - 2: STRUCTURES (MOVABLE, 3: ROADWAY & 4: TRAFFIC SIGNALS & ROADWAY LIGHTING | CHICAGO DEPARTMENT OF TRANSPORTATION | Details |